Loureiro was retained to install a sanitary sewage pump station and associated force main for a manufacturing facility in central Connecticut. The pump station included a wet well with duplex pumps and a pump control building to house system controls, generator and valves. The project was performed with an accelerated schedule to align with abutting projects.

Numerous utility crossings were encountered during the installation of the force main. Some conflicting utilities were rerouted; others were avoided by realigning the force main. A significant section of trench excavation required rock removal. The wet well and pump control building required excavation over 20 feet deep adjacent to existing infrastructure.

Highlights

  • Installation of wet well and duplex submersible pumps
  • Installation of pump control building including emergency generator and ancillary equipment
  • Installation of 9,100 linear feet of 10-inch diameter ductile iron force main