The Allied Leather Tannery Complex Site has a long history of industrial use dating back to the mid-1800s, including long-time use as a textile mill up until the 1940s.
The twin culvert replacement project consisted of two 29-inch by 42-inch corrugated metal pipes conveying stormwater from a drainage swale under Bisson Avenue to a submerged outlet at the bottom of a bank into the Winnipesaukee River.
The Town of Seymour, Connecticut issued a Request-for-Proposal (RFP) for design services for the renovation of three Town buildings including the Library, Town Hall and Police Department.
Supreme Forest Products, Inc. and Quantum Biopower Southington LLC assembled a variety of parcels for redevelopment in an industrial area in Southington, Connecticut.
Loureiro was retained by Skala Partners, LLC, a real estate development and management company, to provide civil and environmental engineering and survey services to permit and construct a 101 residential unit mixed use development in Fairfield, Connecticut.