A vacant, city-owned lot in a rapidly developing area of Boston was redeveloped into commercial (first floor) and residential (upper floors) space to provide housing for low-income residents of Boston.
A vacant, city-owned lot in a rapidly developing area of Boston was redeveloped into commercial (first floor) and residential (upper floors) space to provide housing for low-income residents of Boston.
Loureiro was retained to perform a phased characterization of 2,200 linear feet of brook, 2 ponds, and a 1 acre inland wetland located in Connecticut for a large industrial manufacturing facility.
Sport and Medical Sciences Academy in Hartford, Connecticut engaged Loureiro as the demolition, remediation, site and concrete trade contractor for the construction of its new 195,000 sq. ft. facility.
A large manufacturing company in Connecticut retained Loureiro to perform the remediation of wetlands/watercourses that had been impacted with polychlorinated biphenyls (PCBs), metals, petroleum hydrocarbons, and various other organic compounds.
A real estate company in Norwalk, Connecticut retained Loureiro to provide civil, SMEP, and environmental services and Loureiro Contractors, Inc. and WorkWaste to provide construction and waste management services during construction.
Loureiro Contractors, Inc. (LCI) performed site and concrete work for a major upgrade of the electrical service to the Yale Sterling Chemistry Laboratory (SCL) Building.
Loureiro Contractors, Inc. was the trade contractor for the site excavation, utilities, and piles package for the construction of the Norwalk Water Pollution Control Facility/Wet Weather Preliminary Treatment System.